PROJECT PROFILE | SITE REMEDIATION
System Remediates Free Product Site in One Year
EnviroSolutions remediated a leaking underground storage tank (LUST) site in one year. Contamination from this site migrated to an adjacent property. Free-product, 12 inches thick, extended over 4,000 square feet. In addition, the contaminated groundwater plume extended over 16,000 square feet.
EnviroSolutions installed a remediation system that included a mobile combustor, custom manufactured by EnviroSolutions. The combustor vacuumed liquids and vapor from the ground, burning the vapor contaminants and discharging clean treated air. The system also separated the recovered groundwater and vapor, treating and re-injecting the groundwater into the subsurface.
Sampling of monitoring wells indicated the system removed all of the free-product and reduced the extent of contaminated groundwater by 80% in one year.
The site effectively clean, EnviroSolutions is moving the mobile combustor to another one of our client’s sites. Moving the combustor from site to site saves our clients significant system installation time and costs.